MEZZANINE LOAD BRIEF - INFORMATION FOR PROJECT REVIEW The Mezzanine Experts - a Cogan-affiliated editorial resource Worksheet revision: 2026-11-03 https://themezzanineexpert.com/tools/mezzanine-load-calculator/ This blank worksheet organizes evidence. It does not establish capacity, approve a loading arrangement, replace engineering, or authorize testing. Leave unknown values marked UNKNOWN. Do not substitute example numbers. Keep private project information in your own records; this file submits nothing. 1. PROJECT AND DOCUMENT BASIS Project/location: ______________________________________________________ Existing or proposed platform: _________________________________________ Intended use and proposed changes: _____________________________________ Prepared by/date: ______________________________________________________ Person responsible for obtaining design review: ________________________ Drawing/document references and revisions: _____________________________ Confirmed current documents? Unknown or conflicting records: ___________ Jurisdiction/applicable code basis - for professional confirmation: _____ 2. DOCUMENTED RATING AND AREA Documented uniform live-load rating, including units: ___________________ Exact source/page and date: ____________________________________________ Area covered by that rating, including units: ___________________________ Marked location/zone on the drawing: ___________________________________ Different ratings or excluded zones: ___________________________________ Terminology or included loads needing clarification: ____________________ Do not combine areas with different ratings. A PSF-times-area product is uniform-load arithmetic, not spare capacity or permission for point loads. Do not subtract an assumed floor weight from a documented live-load rating. 3. LOAD INVENTORY - REPEAT FOR EACH DISTINCT ITEM OR ARRANGEMENT Item/use: _____________________________________________________________ Quantity and intended locations (attach marked plan): ___________________ Known weights, units and source documents: _____________________________ Storage layout, dimensions and contact/support locations: _______________ Rack/shelving/product identification and supplier documents: _____________ Equipment model, configuration and attachments: ________________________ Wheel/foot/post loads and spacing from supplier or designer, if available: _______________________________________________________________________ Operating, moving or changing load conditions to review: ________________ Unknown information and who will obtain it: _____________________________ Do not divide an equipment weight by the whole deck area to approve it. Do not invent wheel loads, impact factors, load combinations or test loads. 4. SUPPORTS, EXISTING CONDITIONS AND CHANGES Relevant framing/deck/support/anchor/slab records available: _____________ Missing documents or discrepancies requiring professional assessment: ____ Proposed relocation, equipment or layout changes: _______________________ Related site observations, photographs and their locations: ______________ Restrictions or directions already issued by responsible parties: _______ Record observations without diagnosing capacity. Follow existing directions and obtain appropriate professional assessment of uncertain conditions. 5. OPEN-ITEM AND REVIEW RECORD Item | Information/review needed | Responsible party | Evidence reference ____ | ________________________ | _________________ | __________________ ____ | ________________________ | _________________ | __________________ ____ | ________________________ | _________________ | __________________ Reviewer and scope of review: __________________________________________ Required next steps and unresolved conditions: __________________________ Reference to actual review/decision document, when available: ___________ A completed worksheet is not approval. Keep the actual reviewed documents, conditions and decisions with the project record. SOURCE CONTEXT (reviewed 2026-11-03) OSHA 29 CFR 1910.22(b), within its US scope, requires walking-working surfaces to support the maximum intended load. It does not provide a generic mezzanine rating or a calculation that verifies an existing floor. https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XVII/part-1910/subpart-D/section-1910.22 FCP's guide specification sections 1.8 and 3.2 illustrate the role of plans, framing/anchor details, design submittals and controlled modifications. This manufacturer example is not a universal contract or code requirement. https://fcpmezzanine.com/literature/FCP-Modular-Mezzanines-CSI-Spec.pdf Further context: https://themezzanineexpert.com/learn/mezzanine-load-capacity-explained/ https://themezzanineexpert.com/learn/mezzanine-slab-requirements/ https://themezzanineexpert.com/learn/mezzanine-column-anchor/